Guide · 2026

Software requirements specification template: from idea to fixed price

The short answer: a good software requirements specification describes the goal, the users, what they need to do, what matters most, which systems the solution must talk to, and how you will know it is done. It does not need 40 pages. Two to five pages following the template below is enough for a supplier to give you a fixed price.

10 min read · Updated 29 September 2026

A requirements specification is the document that turns an idea into something a supplier can price. Without it you get quotes that cannot be compared and projects where everyone thought they agreed. With it you get comparable prices, fewer surprises and a shared answer to the question “are we done?”. The template below is the one we wish every client sent us.

Template: the eight blocks of a requirements specification

  1. Goal and objectives: What problem does the system solve, and how will you measure whether it works? For example “halve the time spent on bookings”.
  2. Users and roles: Who uses the system, and what can each role see and do? For example customer, employee and administrator.
  3. User stories: What does each role need to do? Write one sentence per need.
  4. Priorities (must, should, could): What goes into version one, what is wanted, and what can wait?
  5. Integrations: Which systems must the solution talk to, such as e-conomic, MobilePay, MitID or your CRM?
  6. Data: What data exists today, where does it live, and does it need migrating?
  7. Non-functional requirements: GDPR, security, login, performance, accessibility and which devices must be supported.
  8. Acceptance criteria: How will you know a feature is finished and works as agreed?

Example: a requirements specification for a booking system

A shortened example for a service business. Your own version can be just as short.

BlockExample
GoalCustomers book online themselves so the phone is no longer the bottleneck.
RolesCustomer, employee, administrator.
User storyAs a customer I want to see available slots and book, so I do not have to call.
MustBooking, email confirmation, staff calendar.
Should / couldSMS reminder (should), reviews after the visit (could).
IntegrationsMobilePay for payment, e-conomic for invoicing.
Non-functionalData in the EU, data processing agreement, works on mobile.
Acceptance criterionA booking appears in the staff calendar within one minute.

How do you write good user stories?

Use the form “As a [role] I want to [action] so that [benefit]”. The benefit is the most important part, because it tells the supplier why the feature exists, and often opens the door to a simpler solution than the one you had in mind. Write 20 short user stories rather than five long ones. Each story should be testable with an acceptance criterion, such as “once the customer has paid, the booking shows as paid in the admin panel”. Group your user stories by role, so it is easy to see whether a user has been forgotten, and whether the administrator has the tools needed to look after the system day to day.

Who should write the requirements specification?

The person who knows the workflow best, not necessarily the most technical one. Often it is the owner, an operations lead or the employee who keeps the spreadsheet alive today. Talk to the people who will use the system every day before you write: what takes time, what goes wrong, and what do customers ask about? You do not need to know the technical answers. Translating your needs into features, integrations and a price is the supplier’s job.

The most common mistakes in a requirements specification

  • Describing the solution instead of the problem, such as “a button top right” instead of “the customer must be able to cancel”.
  • Making everything a must-have. Then there is no prioritisation and version one gets too big.
  • Forgetting the administrator. Someone has to manage users, content and data behind the screens.
  • Skipping the integrations. They are often the single biggest item in the project.
  • Writing 40 pages nobody reads. Short and precise beats long and exhaustive.
  • Leaving out acceptance criteria, so “done” becomes a matter of opinion.

If you are unsure how the screens should fit together, a clickable prototype is often a better specification than text. At Grundfos we used field research and clickable prototypes to make the customer portals concrete before they were built. If you are still deciding whether to build or buy, read custom software vs off-the-shelf.

From requirements specification to a fixed-price proposal

1

You send the brief

A specification, notes or a short text. The template helps but is not required.

2

We count features

User stories and must-haves become features and integrations.

3

We match a package

12, 24 or 36 features and 1, 2 or 3 integrations.

4

You get a fixed price

A written fixed-price proposal within 24 hours.

How your document becomes a fixed price with us.

24 t

Written fixed-price proposal

12/24/36

Features in Small, Medium and Large

40+

Pre-built integrations

Because the packages have a set number of features and integrations, a good specification translates directly into a price. Small is DKK 18,000 plus DKK 600 a month, Medium DKK 36,000 plus DKK 900 and Large DKK 54,000 plus DKK 1,200. Read why we prefer fixed price over hourly billing, or see all pricing.

Have a specification, a draft or just an idea? Send it to us and we will come back with questions and a written fixed-price proposal within 24 hours.

Questions about requirements specifications

How long should a requirements specification be?
For most SME projects, two to five pages is enough. What matters is not length but that the goal, roles, user stories, priorities, integrations and acceptance criteria are described. A long document nobody reads creates more misunderstandings than a short one everyone has understood.
Do we need a specification before contacting you?
No. A short description of the problem and who will use the solution is enough to get started. We ask the missing questions and come back with a written fixed-price proposal within 24 hours. The template here simply makes the process faster and the proposal more precise.
What is the difference between must, should and could?
Must is what the solution cannot launch without. Should is important but can wait until shortly after launch. Could is nice to have if time and budget allow. The prioritisation lets you launch a first version quickly and add the rest afterwards, instead of waiting for everything.
How do we describe GDPR requirements?
Write down which personal data the system handles, who may see it, how long it must be kept, and whether it must stay in the EU. Ask the supplier for a data processing agreement. If you handle sensitive data, or users must log in with MitID, state it clearly, because it affects both design and price.
Can requirements change during the project?
Yes, and they almost always do. The point of a specification is not to lock everything down but to have a shared starting point. With us, new features after launch can be added at a fixed price per extra feature, so changes never become an open-ended bill.
Is a prototype better than a written specification?
For screens and flows, often yes, because everyone can click through and see whether it makes sense. For integrations, data and GDPR, text is still best. The strongest combination is a short written specification plus a clickable prototype of the most important screens.

Want us to build it for you?

You get a fixed-price proposal within 24 hours.

Dennis Nielsen

Dennis Nielsen

Head of Operations, Ceptiv

Free consultation

One free hour of advice before you start.

Describe your project and I will contact you as soon as possible, so we can schedule a no-obligation meeting. You leave with practical advice on how to get your project off to a good start.

  • Free
  • 1 hour
  • No obligation